Partner Academy · EcoBSS / FLEX
BAT1_VoltHigh_Fault
Energy storage 1 voltage too high
EcoBSS service: DC BUS / energy-storage voltage too high.
Register map
- Family
- Three-phase HV
- Register
- 558
- Bit
- 6
Field checks
- Check that energy-storage voltage is not too high.
- Check PV input voltage and ensure it is within the allowed range.
- Contact Inversol if the fault does not clear.
FAQ
What does EcoBSS F55 mean?
What should I check for EcoBSS F55?
- Check that energy-storage voltage is not too high.
- Check PV input voltage and ensure it is within the allowed range.
- Contact Inversol if the fault does not clear.
When should I contact Inversol?
Partner lookup from EcoBSS Flex register map V1.2 — not a substitute for the official service manual or live measurements. Always match the inverter family (3P LV / FLEX 3L vs 3P HV).