Partner Academy · Deye
Tz Dc OverCurr Fault
Off-grid DC overcurrent fault
Deye service: Tz Dc OverCurr — off-grid inrush on backup.
Field checks
- Reduce inrush currents of loads fed from the backup port in off-grid mode.
If the hybrid restarts many times in production hours with no code, check the DC side the same way as on F24 (insulation and connectors).
For DC / PV checks see solar panels and the inverter hub.
FAQ
What does Deye F20 mean?
How do I tell array from inverter on F20?
Is F20 always a broken MPPT?
Error won't clear? Send a photo of the display to WhatsApp +995 568 999 668: an Inversol engineer will tell you what to check.
Installer or service company? Deye, ECOBSS and Heckman equipment: partner prices on request via WhatsApp.
WhatsAppEquipment for this class
This information is for reference only. Electrical work is performed by a qualified specialist in accordance with the manufacturer's instructions and local regulations. Code names are given per the Deye manual for the stated series and may differ for your model.