Partner Academy · Deye
Working mode change
A change of working mode, grid type, or battery mode, including a remote write from an EMS.
Working mode change — informational. A full power-down (AC and DC) usually clears it.
Field checks
- Fully power the inverter down: AC and DC (energy storage and PV) in the shutdown order from the manual for your series, then switch it on again in the normal order. Work on DC and the energy storage is for a qualified specialist.
- If F13 returns, check who writes parameters: EMS, the app, or a remote mode change.
If the cause is an external command, see F22 (emergency / remote stop).
For this AC-side class see Deye hybrid inverters in Georgia and size a kit in the system constructor.
FAQ
What does F13 mean?
How do I clear F13?
What if F13 returns?
Error won't clear? Send a photo of the display to WhatsApp +995 568 999 668: an Inversol engineer will tell you what to check.
Installer or service company? Deye, ECOBSS and Heckman equipment: partner prices on request via WhatsApp.
WhatsAppEquipment for this class
This information is for reference only. Electrical work is performed by a qualified specialist in accordance with the manufacturer's instructions and local regulations. Code names are given per the Deye manual for the stated series and may differ for your model.