Skip to content

Partner Academy · Deye

Warning W3

Grid Phase Wrong

Incorrect grid phase sequence

Grid Phase Wrong on three-phase inverters: swap two AC phases, or change the Grid Setup phase order.

Field checks

  1. Swap any two AC phases (L1↔L2 or L2↔L3) on the GRID terminal block. Qualified electrician, AC supply off.
  2. If the incoming phase order is reversed, in Grid Setup change the phase-order setting from 0/120/240 to 0/240/120. Write down the original values first. The menu name depends on series and firmware. A qualified specialist does this. Three-phase models only.
  3. Re-check phase rotation before enabling export.

For this AC-side class see Deye hybrid inverters in Georgia and size a kit in the system constructor.

FAQ

What does W3 mean?
Wrong phase order on the AC grid (Grid Phase Wrong). Phase conductors L1, L2, L3 are swapped. Three-phase inverters only.
How do I clear W3?
Either swap two phase conductors (qualified electrician, AC off) or, when the input order is reversed, set Grid Setup phase order from 0/120/240 to 0/240/120 after writing down the original values.

Error won't clear? Send a photo of the display to WhatsApp +995 568 999 668: an Inversol engineer will tell you what to check.

Installer or service company? Deye, ECOBSS and Heckman equipment: partner prices on request via WhatsApp.

WhatsApp

Equipment for this class

This information is for reference only. Electrical work is performed by a qualified specialist in accordance with the manufacturer's instructions and local regulations. Code names are given per the Deye manual for the stated series and may differ for your model.