Partner Academy · Deye
Grid Phase Wrong
Incorrect grid phase sequence
Grid Phase Wrong on three-phase inverters: swap two AC phases, or change the Grid Setup phase order.
Field checks
- Swap any two AC phases (L1↔L2 or L2↔L3) on the GRID terminal block. Qualified electrician, AC supply off.
- If the incoming phase order is reversed, in Grid Setup change the phase-order setting from 0/120/240 to 0/240/120. Write down the original values first. The menu name depends on series and firmware. A qualified specialist does this. Three-phase models only.
- Re-check phase rotation before enabling export.
For this AC-side class see Deye hybrid inverters in Georgia and size a kit in the system constructor.
FAQ
What does W3 mean?
How do I clear W3?
Error won't clear? Send a photo of the display to WhatsApp +995 568 999 668: an Inversol engineer will tell you what to check.
Installer or service company? Deye, ECOBSS and Heckman equipment: partner prices on request via WhatsApp.
WhatsAppEquipment for this class
This information is for reference only. Electrical work is performed by a qualified specialist in accordance with the manufacturer's instructions and local regulations. Code names are given per the Deye manual for the stated series and may differ for your model.