How to Choose a Hybrid Inverter in Georgia
How to size a hybrid inverter for home or business in Georgia: kW class, under 10 ms UPS, 51.2 V LiFePO4 pairing with Deye.
From
6,080₾
The Deye SUN-10K-SG01HP3-EU-AM2 is a High-Voltage (200–850+ V) commercial hybrid for 10 kW AC — the entry HV SKU for smaller commercial feeders that still want thinner DC cabling and a clean BMS topology versus 51.2 V racks.
| Parameter | SUN-10K-SG01HP3-EU-AM2 |
|---|---|
| Energy-storage input data | |
| Battery Type | Lithium-ion |
| Energy storage Voltage Range(V) | 160-700 |
| Max.Charging Current(A) | 37 |
| Max.Discharging Current(A) | 37 |
| Charging Strategy for Li-ion Energy storage | Self-adaption to BMS |
| Number of energy-storage inputs | 1 |
| PV String Input Data | |
| Max. PV Access Power (W) | 20000 |
| Max. PV Input Power (W) | 16000 |
| Max. PV Input Voltage (V) | 1000 |
| Start-up Voltage(V) | 180 |
| MPPT Voltage Range(V) | 150-850 |
| Rated DC Input Voltage(V) | 600 |
| Max Input Short-Circuit Current(A) | 30+30 |
| Max Operating PV Input Current(A) | 20+20 |
| No.of MPP Trackers/No.of String Per MPP Tracker | 2/1+1 |
| AC Input/Output Data | |
| Rated AC Input/Output Active Power(W) | 10000 |
| Max AC Input/Output Apparent Power (VA) | 11000 |
| Peak Power (off-grid)(W) | 1.5 times of rated power,10s |
| Rated AC Input/Output Current(A) | 15.2/14.5 |
| Max AC Input/Output Current(A) | 16.7/16 |
| Max Continuous AC Passthrough (grid to load)(A) | 40 |
| Rated Input/Output Voltage/Range(V) | 220/380V,230/400V 0.85Un-1.1Un |
| Grid Connection Form | 3L+N+PE |
| Rated Input/Output Grid Frequency/Range | 50Hz/45Hz-55Hz 60Hz/55Hz-65Hz |
| Power Factor Adjustment Range | 0.8 leading to 0.8 lagging |
| Total Current Harmonic Distortion THDi | <3% (of nominal power) |
| DC Injection Current | <0.5%ln |
| Efficiency | |
| Max Efficiency | 97.6% |
| Euro Efficiency | 97.0% |
| MPPT Efficiency | >99% |
| Equipment Protection | |
| Integrated | DC Reverse Polarity Protection, AC Output Overcurrent Protection, Thermal Protection, AC Output Overvoltage Protection, AC Output Short Circuit Protection, DC Component Monitoring, Arc Fault Circuit Interrupter (optional), Anti-islanding Protection, DC Switch, Insulation Impedance Detection, Residual Current Detection |
| Surge Protection Level | TYPE II(DC),TYPE II(AC) |
| Interface | |
| Communication Interface | RS485/RS232/CAN |
| Monitor Mode | GPRS/WIFI/Bluetooth/4G/LAN(optional) |
| LCD/LED Display | LCD |
| General Data | |
| Operating Temperature Range | -40 to +60℃, >45℃ Derating |
| Permissible Ambient Humidity | 0-100% |
| Permissible Altitude | 2000m |
| Noise | ≤ 55 dB(A) |
| Ingress Protection(IP) Rating | IP 65 |
| Inverter Topology | Non-Isolated |
| Over Voltage Category | OVC II(DC),OVC III(AC) |
| Cabinet size(W*H*D)[mm] | 408*638*237(Excluding connectors and brackets) |
| Weight[kg] | 30.5 |
| Warranty | 5 Years/10 Years the Warranty Period Depends the Final Installation Site of Inverter, More Info Please Refer to Warranty Policy |
| Type Of Cooling | Intelligent air cooling |
| Grid Regulation | IEC 61727, IEC 62116, CEI 0-21, EN 50549, NRS 097, RD 140, UNE 217002,OVE-Richtlinie R25, G98, G99, VDE-AR-N 4105 |
| Safety EMC/Standard | IEC/EN 61000-6-1/2/3/4, IEC/EN 62109-1, IEC/EN 62109-2 |
Above roughly 20–30 kW of continuous power, 51.2 V architectures begin to punish installers: DC currents climb, mandating 35–50 mm² runs, heavy combiner boxes, and measurable I²R losses on every meter of cable. The 200–850+ V HV bus inverts that equation. A 25 kW charge/discharge profile on HV uses dramatically slimmer conductors and fewer parallel strings, directly cutting Balance of System (BOS) cost before a single kWh is stored.
Energy storage integration follows strict HV rules. Modules such as Heckman RHFP05100A (20–65 kWh scalable racks) or HECKMAN HV RHFP cabinets are wired in series—not parallel stacks of 51.2 V blocks. Every module must be pre-balanced to an identical State of Charge (SOC) before stringing; otherwise the Master BMS will lock out the string. CAN communication from the energy storage Master terminates at the inverter BMS port; grid-side metering typically uses CHINT DTSU 666 on short runs, or Eastron SDM Modbus V2 via RS485/PLC when the measurement point exceeds 30 m.
For Georgian B2B operators facing the 0.35 ₾/kWh tariff, this platform supports peak shaving, time-of-use arbitrage, and unbalanced three-phase loading across commercial feeders. Up to 10 inverters can be paralleled on the SG01HP3 architecture (Master/Slave CAN), scaling toward 250 kW while preserving a single energy storage communication hierarchy. AC Coupling via the GEN port remains available for retrofit sites upgrading legacy On-Grid PV without ripping existing string inverters.
Official product documentation and datasheets.
Datasheet (PDF) PDFNearby power classes and matching LiFePO4 from Tbilisi stock — compare before you quote.
Engineering notes that help you size and choose this product.
How to size a hybrid inverter for home or business in Georgia: kW class, under 10 ms UPS, 51.2 V LiFePO4 pairing with Deye.
Export ~6 tetri, import ~35. Hybrid + LiFePO4 for business — free Inversol consult.
Why a 10 ms hybrid inverter UPS switchover protects servers and POS better than a classic UPS — topology and transfer timing.