AIO for Business: Diesel Generator Alternative
Diesel generator alternative in Tbilisi: AIO / LiFePO4 BESS — 10 ms UPS, peak shaving. Request an Inversol audit!
From
14,125₾
The Deye SUN-30K-SG02HP3-EU-AM3 is a High-Voltage commercial hybrid for 30 kW AC — the AM3 sweet spot for hotels, retail, and light manufacturing peak shaving with modular HV BESS.
| Parameter | SUN-30K-SG02HP3-EU-AM3 |
|---|---|
| Battery Input Data | |
| Battery Type | LiFePO4 |
| Battery Voltage Range (V) | 160-700 |
| Max. Charging/Discharging Current (A) | 75 |
| Charging Strategy for Li-ion Battery | Self-adaption to BMS |
| Number of Battery Input | 1 |
| PV String Input Data | |
| Max. PV Access Power (W) | 60000 |
| Max. PV Input Power (W) | 48000 |
| Max. PV Input Voltage (V) | 1000 |
| Start-up Voltage (V) | 180 |
| MPPT Voltage Range (V) | 150-850 |
| Rated PV Input Voltage (V) | 600 |
| Max. Operating PV Input Current (A) | 36+36+36 |
| Max. Input Short-Circuit Current (A) | 54+54+54 |
| No. of MPP Trackers / No. of Strings per MPP Tracker | 3/2+2+2 |
| AC Input/Output Data | |
| Rated AC Input/Output Active Power (W) | 30000 |
| Max. AC Input/Output Apparent Power (VA) | 33000 |
| Rated AC Input/Output Current (A) | 45.5/43.5 |
| Max. AC Input/Output Current (A) | 50/47.9 |
| Max. Continuous AC Passthrough (grid to load) (A) | 80 |
| Peak Power (off-grid) (W) | 1.5 times of rated power,10s |
| Power Factor Adjustment Range | 0.8 leading to 0.8 lagging |
| Rated Input/Output Voltage | 20/380V, 230/400V 0.85Un-1.1Un 3L+N+PE |
| Rated Input/Output Grid Frequency/Range (Hz) | 50/45-55, 60/55-65 |
| Total Current Harmonic Distortion THDi | <3% (of nominal power) |
| DC Injection Current | <0.5%ln |
| Efficiency | |
| Max. Efficiency | 98.5% |
| Euro Efficiency | 98.0% |
| MPPT Efficiency | >99% |
| Equipment Protection | |
| Integrated Protections | DC Reverse Polarity Protection AC Output Overcurrent Protection Thermal Protection AC Output Overvoltage Protection AC Output Short Circuit Protection DC Component Monitoring Arc Fault Circuit Interrupter (AFCI) (optional) Anti-islanding Protection DC Switch Insulation Impedance Detection Residual Current Detection |
| Surge Protection Level | TYPE II(DC), TYPE II(AC) |
| Interface | |
| LCD/LED Display | LCD+LED |
| Communication Interface | RS485, RS232, CAN |
| Monitor Mode | GPRS/WIFI/Bluetooth/4G/LAN (optional) |
| General Data | |
| Operating Temperature Range (°C) | -40°C to +60°C, >45°C Derating |
| Permissible Ambient Humidity | 0-100% |
| Permissible Altitude | 3000 m |
| Noise (dB) | ≤ 55 |
| Ingress Protection (IP) Rating | IP 65 |
| Inverter Topology | Non-Isolated |
| Over Voltage Category | OVC II(DC), OVC III(AC) |
| Cabinet Size (W×H×D mm) | 448×688×270 (Excluding Connectors and Brackets) |
| Weight (kg) | 46 |
| Type of Cooling | Intelligent Air Cooling |
| Grid Regulation | IEC 61727, IEC 62116, CEI 0-21, EN 50549, NRS 097, RD 140, UNE 217002, OVE-Richtlinie R25, G99, VDE-AR-N 4105 |
| Safety / EMC Standard | IEC/EN 61000-6-1/2/3/4, IEC/EN 62109-1, IEC/EN 62109-2 |
| Key Features (datasheet) | |
| Max. Parallel Units (on-grid and off-grid) | 10 |
| Battery Charge/Discharge Time Periods | 6 |
Source: official Deye datasheet for SUN-25/29.9/30K-SG02HP3-EU-AM3; values are shown for this model.
The economic advantage of the 200–850+ V architecture is driven by basic electrical principles: higher voltage yields proportionally lower current. In a 50 kW system, an HV setup eliminates the need for massive, expensive 50 mm² copper cabling and heavy busbars required by 51.2 V systems. This translates to a significantly lower Balance of System (BOS) cost and minimized voltage drop over distance, making it the only logical choice for commercial plants requiring 40 kWh to several megawatt-hours of storage.
System integration requires strict adherence to HV protocols. Unlike LV systems, HV energy storage modules (such as Heckman RHFP or HECKMAN HV RHFP) are connected in series. It is absolutely critical that all modules are pre-charged to the exact same State of Charge (SOC) before series stringing to prevent BMS lockout. Communication is established by linking the energy storage string's Master BMS directly to the inverter's BMS port via CAN bus. Grid measurement defaults to CHINT DTSU 666; remote utility points beyond 30 m require Eastron SDM Modbus V2 over RS485 or PLC—Power Line Communication over existing phase conductors avoids trenching new meter cables.
Designed to combat the 0.35 ₾/kWh B2B tariff, this inverter supports aggressive peak shaving, dynamic scheduling via EcoBSS EMS / PowerWallet logic, and 100% unbalanced phase output. Up to 10 units can be paralleled (scaling toward 500 kW AC). Safety is paramount: operating at potentially lethal DC voltages up to 850 V, the system demands commercial-grade DC switchgear, strict AC/DC pathway separation, certified PPE, and documented lockout/tagout procedures during commissioning.
Official product documentation and datasheets.
Datasheet (PDF) PDFField notes from Inversol Academy for the codes you are most likely to meet with this equipment.
Nearby power classes and matching LiFePO4 from Tbilisi stock — compare before you quote.
Engineering notes that help you size and choose this product.
Diesel generator alternative in Tbilisi: AIO / LiFePO4 BESS — 10 ms UPS, peak shaving. Request an Inversol audit!
Peak shaving for business in Tbilisi: cut Telasi/Energo-Pro demand peaks without a new feeder. Deye + LiFePO4 — request an audit!
HoReCa solar in Georgia under Net-Billing: self-consumption, evening LiFePO4 buffer, UPS <10 ms, Smart Load, Gen port. LV vs HV and install risks. Request a hotel quote.