Skip to content

From

13,125₾

Deye SUN-20K-SG05LP3-EU-SM2 Hybrid Inverter
SKU
SUN-20K-SG05LP3-EU-SM2
Brand
Deye
SUN-20K-SG05LP3-EU-SM2 Datasheet (PDF)

Deye SUN-20K-SG05LP3-EU-SM2 Hybrid Inverter

Deye SUN-20K-SG05LP3-EU-SM2 (and SUN-14/15/16/18K siblings) — 51.2 V three-phase hybrid for Georgia B2B sites. Download the official SUN-20K-SG05LP3-EU-SM2 datasheet PDF, or configure a quote in the System Constructor. Upper LV tier before HV crossover above ~40 kWh stored.

Tech Specs

Deye SUN-20K-SG05LP3-EU-SM2 Hybrid Inverter — Tech Specs
Parameter SUN-20K-SG05LP3-EU-SM2
Battery Input Data
Battery Type Lead-acid or LiFePO4
Battery Voltage Range (V) 40-60
Max. Charging/Discharging Current (A) 350
Charging Strategy for Li-ion Battery Self-adaption to BMS
Number of Battery Input 2
PV String Input Data
Max. PV Access Power (W) 40000
Max. PV Input Power (W) 32000
Max. PV Input Voltage (V) 800
Start-up Voltage (V) 160
MPPT Voltage Range (V) 160-650
Rated PV Input Voltage (V) 550
Max. Operating PV Input Current (A) 36+36
Max. Input Short-Circuit Current (A) 54+54
No. of MPP Trackers / No. of Strings per MPP Tracker 2/2+2
AC Input/Output Data
Rated AC Input/Output Active Power (W) 20000
Max. AC Input/Output Apparent Power (VA) 22000
Rated AC Input/Output Current (A) 30.4/29
Max. AC Input/Output Current (A) 33.4/31.9
Max. Continuous AC Passthrough (grid to load) (A) 70
Peak Power (off-grid) (W) 2 times of rated power, 10s
Power Factor Adjustment Range 0.8 leading to 0.8 lagging
Rated Input/Output Voltage 220/380V, 230/400V 0.85Un-1.1Un 3L+N+PE
Rated Input/Output Grid Frequency/Range (Hz) 50/45-55, 60/55-65
Total Current Harmonic Distortion THDi <3% (of nominal power)
DC Injection Current <0.5% In
Efficiency
Max. Efficiency 97.6%
Euro Efficiency 97.0%
MPPT Efficiency >99%
Equipment Protection
Integrated Protections DC Reverse Polarity Protection
AC Output Overcurrent Protection
Thermal Protection
AC Output Overvoltage Protection
AC Output Short Circuit Protection
DC Component Monitoring
Arc Fault Circuit Interrupter (AFCI) (optional)
Anti-islanding Protection
DC Switch
Insulation Impedance Detection
Residual Current Detection
Surge Protection Level TYPE II(DC), TYPE II(AC)
Interface
LCD/LED Display LCD
Communication Interface WIFI, RS485, CAN
General Data
Operating Temperature Range (°C) -40 to +60°C, >45°C Derating
Permissible Ambient Humidity 0-100%
Permissible Altitude 3000 m
Noise (dB) <60
Ingress Protection (IP) Rating IP 65
Inverter Topology Non-Isolated (solar), Isolated (battery)
Over Voltage Category OVC II(DC), OVC III(AC)
Cabinet Size (W×H×D mm) 456×750×268.5 (Excluding Connectors and Brackets)
Weight (kg) 51.9
Type of Cooling Intelligent Air Cooling
Grid Regulation IEC 61727, IEC 62116, CEI 0-21, EN 50549, NRS 097, RD 140, UNE 217002, OVE-Richtlinie R25, G99, VDE-AR-N 4105
Safety / EMC Standard IEC/EN 61000-6-1/2/3/4, IEC/EN 62109-1, IEC/EN 62109-2
Key Features (datasheet)
Max. Parallel Units (on-grid and off-grid) 10
Battery Charge/Discharge Time Periods 6

Source: official Deye datasheet for SUN-14/15/16/18/20K-SG05LP3-EU-SM2; values are shown for this model.

Twenty kilowatts AC with multi-module 51.2 V parallel stacks pushes combiner boxes, shunt currents, and maintenance complexity. This SKU remains valid when capital must stay in LV ecosystem inventory (HECKMAN RLFP/MLFP, ECOBSS STORE) and roof DC is moderate. Expect heavier DC cabling than 12K models—engineer cross-parallel wiring (positive to first module, negative to last) for balanced strings.

Feature parity with SUN-12K LP3: 50% single-phase asymmetry allowance (10 kW on one leg), GEN-port AC Coupling, up to 10-unit CAN parallel with Master-only BMS CAN, <10 ms load transfer. Peak shaving against 0.35 ₾/kWh B2B tariffs uses the same CT/PLC metering playbook—CHINT DTSU 666 default, Eastron SDM when distance exceeds 30 m.

Above ~40 kWh storage or 30 kW continuous hybrid power, model HV SG01HP3 TCO—including copper tonnage and labor hours. SUN-20K LP3 is the decision point: maximum LV density before RHFP HV strings win on BOS.

Ideal for

  • ✓ Commercial clients insisting on 51.2 V HECKMAN/ECOBSS inventory
  • ✓ Three-phase sites needing up to ~20 kW backup without HV switchgear
  • ✓ Engineers comparing LV parallel count vs single HV string

Technical FAQ

When should I jump to HV instead of this 20K LV?
When stored energy targets exceed ~40 kWh, DC cable runs are long, or parallel module count exceeds maintainability—HV lowers current and combiner count.
Parallel limits?
Up to 10 SG05LP3 units on CAN parallel; energy storage BMS CAN only on Master; assign sequential Modbus IDs to Slaves.
Compatible energy storage units?
51.2 V LiFePO₄ only—HECKMAN RLFP/WLFP/MLFP and ECOBSS STORE series. HV RHFP are incompatible.
Cable sizing?
Follow Deye manual for 20K DC inputs—typically larger than 12K (approaching 50 mm² class for high continuous charge/discharge).
← Back to catalog: Inverters

Field notes from Inversol Academy for the codes you are most likely to meet with this equipment.

All Deye error codes →

Nearby power classes and matching LiFePO4 from Tbilisi stock — compare before you quote.

Engineering notes that help you size and choose this product.