Net-Billing Georgia: Export 6 vs Import 35 Tetri — Why Storage Wins
Export ~6 tetri, import ~35. Hybrid + LiFePO4 for business — free Inversol consult.
From
13,125₾
Deye SUN-20K-SG05LP3-EU-SM2 (and SUN-14/15/16/18K siblings) — 51.2 V three-phase hybrid for Georgia B2B sites. Download the official SUN-20K-SG05LP3-EU-SM2 datasheet PDF, or configure a quote in the System Constructor. Upper LV tier before HV crossover above ~40 kWh stored.
| Parameter | SUN-20K-SG05LP3-EU-SM2 |
|---|---|
| Energy-storage input data | |
| Battery Type | Lead-acid or Lithium-ion |
| Energy storage Voltage Range (V) | 40-60 |
| Max. Charging/Discharging Current (A) | 350 |
| Charging Strategy forLi-ion Energy storage | Self-adaption to BMS |
| Number of energy-storage inputs | 2 |
| PV String Input Data | |
| Max. PV Access Power (W) | 40000 |
| Max. PV Input Power (W) | 32000 |
| Max. PV Input Voltage (V) | 800 |
| Start-up Voltage (V) | 160 |
| MPPT Voltage Range (V) | 160-650 |
| Rated PV Input Voltage (V) | 550 |
| Max. Operating PV Input Current (A) | 36+36 |
| Max. Input Short-Circuit Current (A) | 54+54 |
| No.of MPPT Trackers/No.of Strings MPP Tracker | 2/2+2 |
| AC Input/Output Data | |
| Rated AC Input/Output Active Power (W) | 20000 |
| Max. AC Input/Output Apparent Power (VA) | 22000 |
| Rated AC Input/Output Current (A) | 30.4/29 |
| Max. AC Input/Output Current (A) | 33.4/31.9 |
| Max. Continuous AC Passthrough (grid to load) (A) | 70 |
| Peak Power (off-grid) (W) | 2 times of rated power, 10s |
| Power Factor Adjustment Range | 0.8 leading to 0.8 lagging |
| Rated Input/Output Voltage | 220/380V, 230/400V 0.85Un-1.1Un 3L+N+PE |
| Rated Input/Output Grid Frequency/Range(Hz) | 50/45-55, 60/55-65 |
| Total Current Harmonic Distortion THDi | <3% (of nominal power) |
| DC Component of Grid | <0.5% In |
| Efficiency | |
| Max. Efficiency | 97.6% |
| Euro Efficiency | 97.0% |
| MPPTEfficiency | >99% |
| Equipment Protection | |
| Integrated | DC Polarity Reverse Connection Protection, AC Output Overcurrent Protection, Thermal Protection, AC Output Overvoltage Protection, AC Output Short Circuit Protection, DC Component Monitoring, Overvoltage Load Drop Protection, Ground Fault Current Monitoring, Arc Fault Circuit Interrupter (optional), Power Network Monitoring, Island Protection Monitoring, Earth Fault Detection, DC Input Switch, DC Terminal Insulation Impedance Monitoring, Residual Current (RCD) Detection, Surge protection level |
| Surge Protection Level | TYPE II(DC),TYPE II(AC) |
| Interface | |
| LCD/LED Display | LCD |
| Communication Interface | WIFI, RS485, CAN |
| General Data | |
| Operating Temperature Range (℃) | -40 to +60℃, >45℃ Derating |
| Permissible Ambient Humidity | 0-100% |
| Permissible Altitude | 3000m |
| Noise(dB) | <60 |
| Ingress Protection(IP) Rating | IP 65 |
| Inverter Topology | Non-Isolated (solar), Isolated (energy storage) |
| Over Voltage Category | OVC II(DC), OVC III(AC) |
| Cabinet Size (WxHxD mm) | 456×750×268.5 (Excluding Connectors and Brackets) |
| Weight (kg) | 51.9 |
| Type of Cooling | Intelligent Air Cooling |
| Warranty | 5 Years/10 Yearsthe Warranty Period Depends the Final Installation Site of Inverter, More Info Please Refer to Warranty Policy |
| Grid Regulation | IEC 61727, IEC 62116,CEI 0-21, EN 50549, NRS 097, RD 140, UNE 217002,OVE-Richtlinie R25, G99,VDE-AR-N 4105 |
| Safety / EMC Standard | IEC/EN 61000-6-1/2/3/4, IEC/EN 62109-1, IEC/EN 62109-2 |
Twenty kilowatts AC with multi-module 51.2 V parallel stacks pushes combiner boxes, shunt currents, and maintenance complexity. This SKU remains valid when capital must stay in LV ecosystem inventory (HECKMAN RLFP/MLFP, ECOBSS STORE) and roof DC is moderate. Expect heavier DC cabling than 12K models—engineer cross-parallel wiring (positive to first module, negative to last) for balanced strings.
Feature parity with SUN-12K LP3: 50% single-phase asymmetry allowance (10 kW on one leg), GEN-port AC Coupling, up to 10-unit CAN parallel with Master-only BMS CAN, <10 ms load transfer. Peak shaving against 0.35 ₾/kWh B2B tariffs uses the same CT/PLC metering playbook—CHINT DTSU 666 default, Eastron SDM when distance exceeds 30 m.
Above ~40 kWh storage or 30 kW continuous hybrid power, model HV SG01HP3 TCO—including copper tonnage and labor hours. SUN-20K LP3 is the decision point: maximum LV density before RHFP HV strings win on BOS.
Official product documentation and datasheets.
SUN-20K-SG05LP3-EU-SM2 Datasheet (PDF) Official Deye datasheetNearby power classes and matching LiFePO4 from Tbilisi stock — compare before you quote.
Engineering notes that help you size and choose this product.
Export ~6 tetri, import ~35. Hybrid + LiFePO4 for business — free Inversol consult.
GNERC 2026 business rates + solar payback ~3 years. Free Inversol ROI quote for Tbilisi sites.
GENEX DAM/IDM live since July 2024; balancing market set for 1 July 2027. Why hybrid + energy storage must be in CAPEX now. Request a site quote.